Note: The following steps are not part of routine maintenance, and only need to be performed when directed by a specific help article, or a member of the Ergatta support team.
This article will explain the process to re-assemble in inner pulley system. Access to the pulleys can be gained by removing the top deck joint connector bolts and the upper tie rods, then lifting the top deck with a gentle rocking motion. A barrel nut will fall from the top deck as the tie rods are removed. Place it in a safe location. The top deck will still be connected to the rower via the wires, and may be left on the rowers tank.
The diagram below shows the correct layout of the inner components.
Note: Ensure that both dowels are placed in the holes further from the main pulley.
For the left-most (upper) guide pulley, place the components onto the dowel (D) in the following order:
- Washer (E)
- Spacer Short (C)
- Washer (E)
- Wave Washer (G)
- Washer (E)
- Guide Pulley
- Spacer (A)
For the right (lower) guide pulley, place the components onto the dowel (D) in the following order:
- Washer (E)
- Guide Pulley
- Washer (E)
- Wave Washer (G)
- Washer (E)
- Spacer Long (B)
When finished, place the top deck back onto the pulley system, making sure all dowels align with the respective holes in the top deck. Re-install the upper tie rods, handle rest bolts, and top deck joint connector bolt in that order. Remember to re-insert the barrel nuts when re-installing the upper tie rods, aligning the hole in the barrel nut with the tie rods.
Please reach out to us if you have any additional questions, and include your rower’s serial number as well as your shipping address.
- Members in the US & Canada
- support@ergatta.com
- Members in the UK/Denmark/Hungary/Estonia
- support@waterrower.co.uk
- Members in Germany/Austria/Switzerland
- service@waterrower.de